With the rain stopping work outside, I turned my attention to some under cover jobs. The other weekend I managed to replace the old imperial none standard stop tap in the washhouse with a new 15min one and with the insulation I rescued from a skip (with permission of the owner). I decided to try and stop the pipes freezing in the winter and to make inside of the washhouse look nicer again.
It was a slow start placing the battens and insulation, one I was started it went well.
Alas I ran out of insulation before I finished the whole wall



No comments:
Post a Comment